Reduce project construction cycle and shorten delivery time
The completion time is uncertain and requires precise execution plans
Refined projects require more flexible and precise construction techniques
Limited working space, requiring a balance between safety and efficiency
Collaborative time planning and refined time management
Professional Time Planner
Develop an overall and regional installation plan that takes into account both the control system and the Capanelli time management tool, and subdivides it to the day.
Mobile devices
Team members can access real-time information on installation plans, accessory schedules, installation priorities, and process details through dedicated equipment.
Senior Elite Service Team of International Industry Technical Experts
Gold Installation Team
The project manager has over 20 years of on-site management experience, and the installation team members have 100% experience in key project services.
International inspection mechanism
Regularly establish an international inspection team composed of domestic and foreign construction experts for on-site supervision to ensure project quality.
Hard core craftsmanship creates a high-quality project construction "gold standard"
Monitoring of shaft installation conditions
Pioneering introduction of mobile construction platforms, flexible response to various installation scenarios in low, high, super high floors, and the entire district.
Laser track calibration technique
Through the self-developed laser track calibration instrument, the construction efficiency has been improved by 50%, and the one-time track calibration qualification rate is 100%.
Comfort adjustment technology
Through the vibration detector for elevator operation, real-time monitoring of minor abnormalities and dynamic adjustments, the comfort level is industry-leading and far superior to national standards.
Flexible installation method, fully coordinated with delivery plan
Mobile construction platform
Pioneering introduction of mobile construction platforms, flexible response to various installation scenarios in low, high, super high floors, and the entire district.
Segmented installation mode
When the villa is not yet completed, it is constructed in a partition style to maximize the delivery time of the elevator and truly synchronize with the villa.
Risk resistant construction protective layer process
The Capanelli home elevator has a construction protection process that isolates high-altitude falling objects, rainwater and other disturbances, achieving safe and efficient installation.
Intersegment docking correction technology
In the case of simultaneous construction of multiple sections, it is still possible to achieve a deviation of less than 0.5mm for the installation of multiple tracks.